925 658 1600

info@welyons.com

Month: October 2020

MORGAN HILL COUNTRY SCHOOL

project description Morgan Hill Country School needed to construct a K-8 grade school on their new 12-acre site before the start of the school year. The fast-track, design-build project included complete site development, classrooms and offices, as well as a computer lab and gymnasium. To meet an aggressive schedule, design and construction were performed simultaneously. …

MORGAN HILL COUNTRY SCHOOL Read More »

FREMONT CHRISTIAN SCHOOL

project description Selected through a competitive design-assist process, W.E. Lyons Construction was tasked with lending both Metal Building design assistance and competitive subcontractor selection. The K–8 grade school building includes eight classrooms, administration offices and a computer lab. Atrium skylights provide day lighting and reduced energy consumption. The project team overcame weather, pedestrian traffic, “drop-off” …

FREMONT CHRISTIAN SCHOOL Read More »

LEAP OF FAITH FARMS

project description With our long history with both equine related projects and the design-build delivery method, W.E. Lyons Construction was selected to provide Preconstruction, Entitlement, Design, and Construction Services for this 10-acre facility.  Forming a team with the Owner and Civil Engineer, environmental management and equine operating plans were formulated, submitted, and approved by the …

LEAP OF FAITH FARMS Read More »

CCWD MAINTENANCE BUILDING

project description The Contra Costa Water District Maintenance Buildings projects in Concord and Antioch consisted of two separate 20,000 square foot facilities, 40 miles apart. The scope of the project included high-bay shop facilities, conventional offices, conference rooms, break rooms, locker rooms and showers. Using the design-build project delivery approach the entire project was completed …

CCWD MAINTENANCE BUILDING Read More »

BODE GRAVEL

project description The W.E. Lyons Construction design-build team worked closely with San Francisco’s City, Port, and County planning departments to design a unique plant configuration that included environmental compliance requirements as well as space and height restrictions. State-of-the-art dust suspension collection equipment and storm water pollution control were also installed. The building design also incorporated …

BODE GRAVEL Read More »

GATEWAY GENERATING STATION

project description Through competitive bidding, W.E. Lyons Construction was contracted to design-build the new PG&E administration and control buildings for the 500-megawatt power plant.  The two new pre-engineered metal buildings included a control room with a depressed foundation, raised computer floor, chemical testing laboratories, and modern offices.  To achieve the Owner required LEED certification, W.E. …

GATEWAY GENERATING STATION Read More »