925 658 1600

info@welyons.com

JETRO CASH & CARRY/RESTAURANT DEPOT

project description

This design-build project included demolition of an existing 90,000 square foot building and ground-up construction of a 63,000 square foot metal building system. Construction included six shipping & receiving docks and 10,000 square feet of temperature controlled walk-in coolers and freezers. To reduce costs, W.E. Lyons Construction millwrights installed owner-furnished equipment such as dock equipment, cash wraps, racking systems and emergency generator systems.

services

  • Preconstruction Services
  • Design-Build
  • Pre-engineered Metal Building
  • Value Engineering

Location

  • San Francisco, CA