925 658 1600

info@welyons.com

Commercial

APP Hangar

project description APP FBO & Storage Hangar is a design/build 20,000 square foot private hangar catering to the executive/personal jet market. In addition to the hangar is a 3,500 square foot passenger terminal that includes offices, lounges, food preparation and crew rest areas. As the general contractor Lyons was responsible for all permitting that included …

APP Hangar Read More »

Cupertino City Center

project description The project is a renovation to the existing Cupertino City Center high rise buildings built in the 80’s. The existing site contains 2 high rise towers connected by a podium of 2 levels of underground parking. The roof of the parking podium contains a plaza that connects the two buildings, with original stairs, …

Cupertino City Center Read More »

FM Industries

project description FM Industries provides manufactured products to the Semi-conductor industry and was in need of additional manufacturing capacity. This two phased project started with retrofitting an existing 35,000 sf warehouse followed by the addition of a 37,000 sf ground-up precast addition. The scope of work included: sitework, building foundations, deep equipment footings, precast walls, …

FM Industries Read More »

1545 Park Ave

project description Alteration to existing building and 2nd floor addition within existing building shell. Work includes seismic, roof replacement, accessible toilet room facilities, stairs/elevators, HVAC/Plumbing/Electrical and Site improvements.    services General Contracting Design-assist Conceptual Estimating/Budgetting Pre-engineered Metal Building Location Emeryville, CA

LEAP OF FAITH FARMS

project description With our long history with both equine related projects and the design-build delivery method, W.E. Lyons Construction was selected to provide Preconstruction, Entitlement, Design, and Construction Services for this 10-acre facility.  Forming a team with the Owner and Civil Engineer, environmental management and equine operating plans were formulated, submitted, and approved by the …

LEAP OF FAITH FARMS Read More »

MAGGIORA & GHILOTTI

project description This 18,000 square foot design-build project included the consolidation of offices, storage areas and maintenance/repair shops into a single structure. The design combined three rigid-frame Varco-Pruden metal building systems to attain the Owner’s goal to consolidate their operations. Awards Honorable Mention, Metal Architecture Magazine services General Contracting Design-Build Pre-engineered Metal Building Location San …

MAGGIORA & GHILOTTI Read More »

BYRON-BETHANY IRRIGATION DISTRICT

project description The Byron-Bethany Irrigation District serves a 100 square mile area of Eastern Contra Costa County providing municipal, industrial, and agricultural water to over 150 customers.  W.E. Lyons Construction assembled a proven design-build team to deliver the new 35,000 square foot facility on a single site reducing overall operating costs and increasing efficiency.  The …

BYRON-BETHANY IRRIGATION DISTRICT Read More »