The Contra Costa Water District’s new Administration Building included conventional offices, conference rooms, and break rooms. A dramatic atrium style entry was designed to create a unique architectural appeal and because the new building houses the District’s Emergency Operations Center, the structural framework of the building was designed as an “essential facility”. Design, permitting, and construction were completed within 12-months